Sunnyside Gold Corp. installed three bulkheads in the American Tunnel. Bulkhead #1 traps water in the Sunnyside Mine workings deep underground, and Bulkheads #2 and #3 are closer to the surface, intended to stop drainage that enters the American Tunnel below the mine workings.